Table 1-5     Workflow for connections through crossbar boxes (continue d)
Step (work time (*1))
Work description
30
Confirm the start/stop of the physical
partition and the connection of the
console.
*1 Average work time for the 8BB configuration/16BB configuration. Work time is written in the order of the 8BB configuration to 16BB
configuration.
*2 Time required for mounting optional components is not included.
*3 If the optional components are ordered together with the SPARC M10-4S, they are shipped mounted to the chassis.
*4 If the chassis is shipped mounted on the rack, the BB-ID has been set.
*5 A cable connection between the racks is required when two racks are configured together.
*6 One CD-ROM disk containing a CPU Activation certificate is provided with the system. The system may be shipped with a registered
CPU Activation key.
Note - The SPARC M10 systems have Oracle Solaris preinstalled. According to the purpose,
either use the preinstalled Oracle Solaris as is or reinstall it.
To reinstall Oracle Solaris, install the latest Oracle VM Server for SPARC. For the latest
information on the supported Oracle Solaris versions and SRU, see the Fujitsu M10/SPARC
M10 Systems Product Notes.
1.4
Workflow when Connecting the PCI
Expansion Unit
The PCI expansion unit is a 2U chassis with 11 PCI slots. It can be connected to all
models of the SPARC M10-1, SPARC M10-4, and SPARC M10-4S. It can be connected
during installation work for the SPARC M10 system.
This section describes the flow from PCI expansion unit installation to component
status checks.
 
By clicking a reference in " " to display a section, you can see the details of the
respective step.
Table 1-6     Workflow when connecting the PCI expansion unit
Step (work time (*1))
Work description
Installation work (approx. 38 minutes (*2))
1
Check the latest information available
in the Fujitsu M10/SPARC M10 Systems
Product Notes.
2
Before installing the system, check the
safety precautions, system specifications,
and necessary conditions for
installation.
Fujitsu M10/SPARC M10 Systems Installation Guide ・ July 2015
12
Reference
"7.13 Starting and Stopping a
Physical Partition
(PPAR)"
Reference
Fujitsu M10/SPARC M10 Systems
Product Notes
"Chapter 2 Planning and Preparing
for System
Installation"
Required
Required
Required