Fujitsu M10 Installation Manual page 287

Hide thumbs Also See for M10:
Table of Contents

Advertisement

In the following example, system boards 00-0, 01-0, 02-0, and 03-0 are in the
system board pool.
XSCF>   showboards -a
PSB     PPAR-ID(LSB)   Assignment     Pwr     Conn   Conf   Test         Fault
----   ------------   -----------   ----   ----   ----   -------   --------
00-0   SP                       Available       n         n         n         Passed     Normal
01-0   SP                       Available       n         n         n         Passed     Normal
02-0   SP                       Available       n         n         n         Passed     Normal
03-0   SP                       Available       n         n         n         Passed     Normal
7.
Execute the initbb command from the master XSCF to release the target
SPARC M10-4S from the system and initialize it.
In bb_id, specify the ID (BB-ID) identifying the chassis.
XSCF>   initbb -b bb_id
The following example releases BB#03 from the system and initializes it.
XSCF>   initbb -b 3
You   are   about   to   initialize   BB/XB-Box.
NOTE   the   following.
1.   BB/XB-Box   is   excluded   from   the   system   and   halted.
2.   PPAR-ID   of   the   same   value   as   BB-ID   becomes   invalid.
Continue?   [y|n]   : y
Note - After the execution of the initbb command, the target chassis is released from the
system and enters the stopped state. Do not disconnect the power cords or various cables
until the XSCF STANDBY LED on the panel and the rear READY LED of the target chassis
are off.
Note - For the initialization of the chassis of the master XSCF, perform that work at the end.
Execute the restoredefaults -c factory command to return to the factory defaults, including
the CPU Activation key information. Perform this work with a serial connection to the
master XSCF.
For XCP 2041 or later, execute the restoredefaults -c factory -r activation command.
The key must be reinstalled at initial setup of the XSCF after installation.
8.
Remove the power cords from the power supply units of the target SPARC
M10-4S.
9.
Remove the XSCF BB control cables from the target SPARC M10-4S.
10. Remove the crossbar cables from the target SPARC M10-4S.
11. If the removal changes the configuration to the 1BB configuration, remove the
XSCF DUAL control cable.
12. Remove the target SPARC M10-4S from the rack.
Remove the SPARC M10-4S from the rack by reversing the mounting procedure.
Chapter 9 Installing a System with a Building Block Configuration
273

Advertisement

Table of Contents
loading

Table of Contents