Fujitsu M10 Installation Manual page 30

Hide thumbs Also See for M10:
Table of Contents

Advertisement

Table 1-9     Operation for when the installation/removal/replacement of the PCI expansion unit is performed
for the PCI slot of the SPARC M10 chassis for which the direct I/O function has been enabled
Maintenance environment
When a PPAR is installed/removed
after it has stopped
When a failed PCI expansion unit is
replaced after the PPAR has stopped
(*1)
When a normal PCI expansion unit is
replaced after the PPAR has stopped
(*1)
*1 This includes the situation in which a link card, link cable, management cable, or link board is replaced.
Fujitsu M10/SPARC M10 Systems Installation Guide ・ July 2015
16
Domain configuration
factory-default
With guest domain
factory-default
With guest domain
factory-default
With guest domain
Reconfiguring Oracle
Setting OpenBoot
VM Server for SPARC
PROM environment
config
variables again
Not required
Not required
Required (XML)
Required
Not required
Not required
Required (XML)
Required
Not required
Not required
Not required
Not required

Advertisement

Table of Contents
loading

Table of Contents