Chapter 3 Installing The System; Preparing The Necessary Tools/Information For Installation - Fujitsu M10 Installation Manual

Hide thumbs Also See for M10:
Table of Contents

Advertisement

Chapter 3
Installing the System
This chapter describes the work of preparing for installation, mounting a chassis in a
rack, and mounting optional components.

Preparing the Necessary Tools/Information for Installation

Confirming Delivered Components
Installing a Rack
Mounting the Chassis in a Rack
Mounting Optional Components
3.1
Preparing the Necessary Tools/
Information for Installation
This section describes the tools and information that are required in installation.
Have these prepared before starting installation work.
Table 3-1     List of necessary tools
Name
Phillips screwdriver (#2)
Phillips screwdriver (#3)
Wrench or box wrench (M8 screws securing rack
package: nominal size 13)  
Wrench or box wrench (M10 screws securing rack
package: nominal size 17)
Allen wrench (M12 screws securing top cover: nominal
size 8)
Use
Used to attach cable support brackets and mount
optional components
Used to connect racks and attach rails to the rack
supporting columns
Used to unpack an ordinary rack package
Used to unpack an ordinary rack package
Used to connect racks
67

Advertisement

Table of Contents
loading

Table of Contents