Points To Note On Configurations With The Pci Expansion Unit Connected - Fujitsu M10 Installation Manual

Hide thumbs Also See for M10:
Table of Contents

Advertisement

Table 1-6     Workflow when connecting the PCI expansion unit (continued)
Step (work time (*1))
Work description
3
Prepare the necessary tools/
information for installation.
4
Confirm the delivered components.
5
Install the rack.
6
Mount the PCI expansion unit in the
rack.
7
If there are optional components,
mount them on the PCI expansion unit.
8
Connect the link cable and management
cable to the PCI expansion unit.
Attach the core to the power cord, and
connect the power cord to the power
supply unit.
Initial diagnosis (approx. 45 minutes)
9
Connect the system management
terminal to the chassis that has the PCI
expansion unit connected to it.
10
Turn on the input power.
11
Log in to the SPARC M10 system
connected to the PCI expansion unit.
12
Perform an initial diagnosis test on the
physical system board (PSB).
13
Check the status of mounted
components.
*1 Average work time
*2 Time required for mounting optional components is not included.
*3 If the optional components are ordered together with the chassis, they are shipped mounted to the chassis.
*4 It is assumed that a link card is installed in the chassis to which the PCI expansion unit is to be connected. If a link card is installed on
site, see "Chapter 10 Maintaining the Link Cards" in the PCI Expansion Unit for Fujitsu M10/SPARC M10 Systems Service Manual.
Points to note on configurations with the PCI
expansion unit connected
SPARC M10-1
In either of the following cases, the logical domain configuration of a physical
Reference
"3.1 Preparing the Necessary
Tools/Information for
Installation"
"3.2.4 Confirming the delivered
components of the PCI expansion
unit"
See the manual for each rack.
"3.3.2 Securing the
rack"
"3.4.3 Mounting the PCI expansion
unit in a
rack"
"3.5.3 Mounting optional
components in the PCI expansion
unit"
"5.3 Connecting Cables to the PCI
Expansion
Unit"
"6.1 Connecting the System
Management Terminal to the
"6.2.2 Turning on the input power
and starting the
XSCF"
"6.3 Logging In to the
XSCF"
"6.7 Performing a Diagnosis
"6.8 Checking the Component
Status"
Chapter 1 Understanding the Installation Flow
Required
Required
Required
Required
Optional (*3)
Required
(*4)
Required
Chassis"
Required
Required
Test"
Required
Required
13

Advertisement

Table of Contents
loading

Table of Contents