Fujitsu M10 Installation Manual page 33

Hide thumbs Also See for M10:
Table of Contents

Advertisement

- Do not install this chassis in the rack if the chassis may make the entire rack
unstable.
- Weight of this chassis in the maximum configuration:
Model SP-1S (SPARC M10-1): 18 kg
Model SP-4SBB (SPARC M10-4S): 60 kg
Model SP-4SNB (SPARC M10-4): 58 kg
Model SP-PCI-BOX (SPARC PCI-BOX): 22 kg
If the chassis is supplied power from a power strip or the service outlet of another
chassis, it may overload the power strip or the power cord of the other chassis.
- Confirm that the power strip or the power cord of the service outlet exceeds the
combined ratings of all the equipment to which it supplies power.
Electrical ratings of this chassis:
Model SP-1S: 100-120/200-240 VAC, 10.0/5.0 A, 50/60 Hz, single phase
(maximum of 2 inputs)
Model SP-4SBB: 200-240 VAC, 16.0-13.4 A, 50/60 Hz, single phase (maximum of
2 inputs)
Model SP-4SNB: 200-240 VAC, 15.0-12.5 A, 50/60 Hz, single phase (maximum of
2 inputs)
Model SP-PCI-BOX: 100-120/200-240 VAC, 5.0-4.2/2.5-2.1 A, 50/60 Hz, single
phase (maximum of 2 inputs)
Be sure to securely ground the rack-mounted equipment. Pay particular attention
to power supply connections other than the direct connections to branch circuits
(e.g., use of power strips).
Caution - If all the power cords of this chassis are connected to one power strip, a
high leakage current may flow through the grounding wire of the power strip. Be
sure to connect the wire to ground before connecting the power supply. If the power
strip is not directly connected to a branch circuit, a power strip that has an
industrial-type attachment plug must be used.
Install this equipment such that it is near a wall and a power outlet is easily
accessible.
- Rack configuration
Note - If the combination of chassis mounted in an installed rack differs from the following
specifications, re-verification by an appropriate safety certification body is necessary. For
installation of the product, begin at the bottom of the rack.
Chapter 2 Planning and Preparing for System Installation
19

Advertisement

Table of Contents
loading

Table of Contents