Mitsubishi Electric MELFA FR CR800 Series User Manual page 620

Industrial robots
Table of Contents

Advertisement

While the I/O simulator is operating, the I/O simulator icon is displayed in the task tray.
When a previously-used I/O simulator definition file exists, it is possible to start the robot simulator and I/O
simulator simultaneously. Check the checkbox [Start I/O Simulator with the definition file used last] on the [Select
the project] screen which is displayed before starting the simulation.
Figure 23-14 Start robot simulator and I/O simulator simultaneously
During the simulation, the signal values of the robots can be checked on the signal monitors. For details, refer to
"14.3.1 General signal" and "14.3.4 Register (CC-Link/EtherCAT)". To check the signal value of GX
Simulator2, 3 devices, use GX Works2, 3.
23-620
Click the icon to open
menu.
Figure 23-13 Icon of I/O simulator
23-620

Advertisement

Table of Contents
loading

Table of Contents