Programming - NEC Univerge SV9100 Manual

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

Issue 2.0
S
5
N
ECTION
ET
5.1
SV9100 Networking Manual
L
F
INK
UNCTIONS

Programming

The following programs require a GCD-CP10 reset after making a change via
PCPro, Web Pro and handset programming.
Program
10-12-01
10-12-02
10-12-09
10-12-10
51-01-01
51-15
84-03-06
90-04
90-58
10-46-07
84-23
When Program 90-08-01 System Reset is performed from any site in a NetLink
Network, the Primary System will be reset.
Minimum Required Programming
10-12-09 : GCD-CP10 Network Setup – VoIP Daughter Board IP Address
Set the LAN IP address VoIP daughter board. The IP number increases by one
for each increase in the slot number.
10-12-10 : GCD-CP10 Network Setup – VoIP Daughter Board Subnet Mask
Define the subnet mask for the channel VoIP daughter board. The setting of
Subnet Mask errors when all Host Addresses are 0.
51-01-01 : NetLink System Settings – NetLink System ID
This is the ID number (0 = Disabled, 1-50) that identifies each SV9100 in the
NetLink network. Each SV9100 must have a unique number in the network.
When this option is set to 0, NetLink is disabled.
The SV9100 must be reset when changing this option.
51-03-01 : NetLink Internet Protocol Address List Setting – Internet
Protocol Address List
The communications server sees the Primary SV9100 from in this list. When no
Primary SV9100 is seen or Fail-Over occurs, the Node List is referred to
establish a new link. This setting is necessary when Program 51-01-03 is set to
0 or Program 51-05-02 is other than 0.
When Changed via
Handset, Web Pro, PCPro
Handset, Web Pro, PCPro
Handset, Web Pro, PCPro
Handset, Web Pro, PCPro
Handset, Web Pro, PCPro
Handset, Web Pro
Handset, Web Pro, PCPro
Handset Programming
Handset Programming
PCPro
Handset, Web Pro, PCPro
10-25

Advertisement

Table of Contents
loading

Table of Contents