Figure 11-1 Napt Configuration Example; Requirements - NEC Univerge SV9100 Manual

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

1.2
11-2
The example below is with 256 DSP Resources licensed to the GCD-CP10. Your
Port forwarding range could change depending on number of DSP Resource
Licenses.

Figure 11-1 NAPT Configuration Example

Requirements

The following information provides requirements for NAPT.
1.2.1
Main Software
NAPT is supported with the V1000/V1.00 or higher release of the SV9100.
1.2.2
Hardware
The SV9100 requires the following hardware:
GCD-CP10
GPZ-IPLE
1.2.3
Capacity
896 Extensions (as allowed by hardware and licensing).
Issue 2.0
NAPT

Advertisement

Table of Contents
loading

Table of Contents