Removal and reinstallation of the operation panel or the front covers....................................................................33
2.3
Installation of the inverter and enclosure design ....................................................................................................37
Main circuit terminals ..............................................................................................................................................54
2.6
Control circuit..........................................................................................................................................................68
2.7
Communication connectors and terminals..............................................................................................................83
2.8
Connection to a motor with encoder (Vector control) .............................................................................................86
2.9
Parameter settings for a motor with encoder..........................................................................................................93
2.10
Connection of stand-alone option units ..................................................................................................................96
2.11
Wiring for use of the CC-Link IE Field Network (FR-A800-GF) ............................................................................107