2 Installation and commissioning
2.5.11 Installation of cooling fan for motors (option)
Continued
A
B
C
Installation, separate fan cabling axis 1 or 2
The procedure below details how to install the separate cabling for the cooling fan
of axis 1 or 2.
1
2
3
4
5
6
Continues on next page
100
Cable bracket
Connector R1.SW2/3, connected to the robot base
Connector R3.FAN2, connected to the fan of axis 1 or 2
Action
Move the robot to its calibration position.
DANGER
Turn off all:
electric power supply to the robot
hydraulic pressure supply to the robot
air pressure supply to the robot
Before entering the robot working area.
Remove the rear cover plate from the robot base.
Remove the cable bracket (A)
Fit the plate for customer connections, if not
already fitted, to the connection plate of the robot
base.
Run the cabling up through the base and frame,
beneath the balancing device.
© Copyright 2007 - 2018 ABB. All rights reserved.
Note
This is detailed in section
chronization marks and synchron-
ization position for axes on
page
400.
xx1800000161
Shown in the figure
Separate
cabling for axis 1 or 2 on page 99
Art. no. is specified in
Required
equipment on page
97.
xx1800000162
Product manual - IRB 7600
3HAC022033-001 Revision: V
Syn-

Advertisement

Table of Contents
loading

Table of Contents