ABB IRB 7600 Series Product Manual page 243

Hide thumbs Also See for IRB 7600 Series:
Table of Contents

Advertisement

Equipment, etc.
Circuit diagram
Removal, cable harness, axes 5-6
The procedure below details how to remove the upper arm cable harness.
1
2
3
4
5
6
7
8
9
10
11
Refitting, cable harness, axes 5-6
The procedure below details how to refit the upper cable harness.
1
Product manual - IRB 7600
3HAC022033-001 Revision: V
Action
Position the upper arm as follows:
Axis 4: 0 degrees
Axis 5: +90 degrees
Axis 6: no significance
DANGER
Turn off all:
electric power supply to the robot
hydraulic pressure supply to the robot
air pressure supply to the robot
Before entering the robot working area.
Remove the left hand side wrist cover by unscrewing its
attachment screws.
Note
Axis 5 must be oriented in the correct position (+90º) to
allow the motor 6 cover to open!
Disconnect all connectors at motor 5 and motor 6.
Remove the plastic cover on the rear of the upper arm,
by removing the attachment screws.
Remove the spiral plate by unscrewing the screw at the
bottom of the spiral cup.
Remove eventual cable straps from the harness.
Disconnect connector R2.M5/6 at the cable harness di-
vision.
Remove the cable attachment inside the upper arm.
Gently pull the cable harness out.
Action
Position the upper arm as follows:
Axis 4: 0 degrees
Axis 5: +90 degrees
Axis 6: no significance
© Copyright 2007 - 2018 ABB. All rights reserved.
4.3.2 Replacement of cable harness, axes 5-6
Spare part no.
Note
See chapter
page
447.
Note
4 Repair
Continued
Circuit diagram on
Note
Specified in the figure
Loca-
tion of cable harness ax 5-6
on page
242.
Shown in the figure
Location
of cable harness ax 5-6 on
page
242.
Continues on next page
243

Advertisement

Table of Contents
loading

Table of Contents