ABB IRC5 Product Manual page 127

Panel mounted controller
Hide thumbs Also See for IRC5:
Table of Contents

Advertisement

PMC large:
xx1100000483
A
B
Procedure
The procedure below details how to install an EPS board.
1
2
Product manual - IRC5 Panel Mounted Controller
3HAC047137-001 Revision: AB
2.9.6 Installing the EPS board DSQC 646 for Electronic Position Switches
EPS board
Axis computer
Action
DANGER
Before doing any work inside the cabin-
et, disconnect the mains power. For
more information, see
Electrical safety
on page
35.
ELECTROSTATIC DISCHARGE
(ESD)
The unit is sensitive to ESD. Before
handling the unit read the safety inform-
ation in section
The unit is sensitive to
ESD on page
48.
© Copyright 2007-2024 ABB. All rights reserved.
2 Installation and commissioning
A
B
Note/illustration
Continues on next page
Continued
127

Advertisement

Table of Contents
loading

Table of Contents