Epson C Series Maintenance Manual page 234

6-axis robots
Hide thumbs Also See for C Series:
Table of Contents

Advertisement

C8 Maintenance 3. Covers
C8-A1401*B* (C8XL)
Removal
1.
2. Remove the bolts on the heat sink.
3. Remove the heat sink.
NOTE
4. Remove the bolts, and then remove the base cover and the
NOTE
C8-A1401*B* (C8XL)
Installation
1.
2.
NOTE
214
Remove the fan.
For details, refer to C8 Maintenance 15. Replacing the Fan.
Hexagon socket head cap bolts: 4-M4×15
For cleanroom and protection models, remove the gasket
between the heat sink and the base cover.
base rear gasket.
Hexagon socket head cap bolts: 11-M4×10
The gasket has the spacers. Be careful not to lose them.
Install the spacers to the holes on the gasket.
(11 places)
Apply the liquid gasket to the base rear gasket.
Install the base rear gasket to the base cover.
(See the figure for gasket applying points)
Gasket
Applying
point (×11)
After applying the liquid gasket, leave the gasket until the liquid gasket becomes
solid and the gasket is fixed.
Spacer (×11)
Base rear gasket
Base cover
C Series Maintenance Manual Rev.2

Advertisement

Table of Contents
loading

This manual is also suitable for:

C4

Table of Contents