Epson C Series Maintenance Manual page 532

6-axis robots
Hide thumbs Also See for C Series:
Table of Contents

Advertisement

C12 Maintenance 5. Joint #1
5. Remove the cable interference prevention plate.
Hexagon socket head cap bolts: 2-M3×6
6. Remove the base cable bracket (C1).
Hexagon socket head cap bolts: 2-M3×6
7. Remove the Joint #1 timing belt.
8. Remove the Joint #2 motor unit.
For details, refer to C12 Maintenance 6.1 Joint #2 - Replacing the Motor, Removal steps (1) to (9).
9. Remove the Joint #1 cable fixing plate (Arm #1 side).
Hexagon socket head cap bolts: 2-M4×10
10. Remove the connector connected to the control board 1.
Connector: GS01
512
C Series Maintenance Manual Rev.2

Advertisement

Table of Contents
loading

This manual is also suitable for:

C4

Table of Contents