Epson C Series Maintenance Manual page 447

6-axis robots
Hide thumbs Also See for C Series:
Table of Contents

Advertisement

2. General Maintenance
This chapter describes maintenance inspection procedures.
inspection properly is essential to prevent trouble and ensure safety.
Be sure to perform the maintenance inspections in accordance with the schedule.
2.1 Maintenance Inspection
2.1.1 Schedule for Maintenance Inspection
Inspection points are divided into five stages: daily, monthly, quarterly, biannual, and annual.
The inspection points are added every stage.
If the Manipulator is operated for 250 hours or longer per month, the inspection points must
be added every 250 hours, 750 hours, 1500 hours, and 3000 hours operation.
1 month (250 h)
2 months (500 h)
3 months (750 h)
4 months (1000 h)
5 months (1250 h)
6 months (1500 h)
7 months (1750 h)
8 months (2000 h)
9 months (2250 h)
10 months (2500 h)
11 months (2750 h)
12 months (3000 h)
13 months (3250 h)
h = hour
C Series Maintenance Manual Rev.2
Daily
inspection
inspection
20000 h
C12 Maintenance 2. General Maintenance
Inspection Point
Monthly
Quarterly
inspection
Performing maintenance
Biannual
Annual
inspection
inspection
Overhaul
(replacement)
427

Advertisement

Table of Contents
loading

This manual is also suitable for:

C4

Table of Contents