Joint #5 - Replacing The Timing Belt - Epson C Series Maintenance Manual

6-axis robots
Hide thumbs Also See for C Series:
Table of Contents

Advertisement

C8 Maintenance 9. Joint #5
5. Install the Joints #5 and #6 motors.
For details, refer to Installation steps in C8 Maintenance 9.1 Joint
#5 – Replacing the Motor and C8 Maintenance 10.1 Joint #6 –
Replacing the Motor.
6. Install the removed covers.
For details, refer to C8 Maintenance 3. Covers.
7. Perform the calibration.
For details, refer to C8 Maintenance 16. Calibration.

9.3 Joint #5 - Replacing the Timing Belt

Maintenance
Joint #5 timing belt
Parts
Belt tensile jig
Hexagonal wrench
(width across flats: 3 mm)
Tools
Cross-point screwdriver (#2)
Torque wrench
Belt tension meter
* The belt tensile jig is an assembly jig. Use the jig when adjusting belt tension.
The brake is mounted on each joint to prevent the arm from lowering due to its own weight while the
Controller power is OFF or the motor is OFF status. The brake does not work during replacement.
Be careful when performing maintenance work.
378
Name
330 mm
Qty.
1
1655932
1
1674582
1
For M4 hexagon socket head cap bolts
1
For cross recessed head screws
1
For tightening torque control
1
Refer: Unitta U-505
C Series Maintenance Manual Rev.2
Note

Advertisement

Table of Contents
loading

This manual is also suitable for:

C4

Table of Contents