Epson C Series Maintenance Manual page 67

6-axis robots
Hide thumbs Also See for C Series:
Table of Contents

Advertisement

71. Apply tension to the Joint #2 motor unit and fix it.
For details, refer to C4 Maintenance: 6.1 Joint #2 – Replacing the Motor, Installation step 6.
72. Mount the following covers and plates.
Arm #3 head cover
Arm #2 side cover (Both sides) Arm #1 side cover (Both sides)
Arm #1 top cover
For details, refer to C4 Maintenance: 3. Covers.
73. Perform the calibration.
For details, refer to C4 Maintenance: 16. Calibration.
C Series Maintenance Manual Rev.2
Arm #3 bottom cover
Connector plate
C4 Maintenance 4. Cable Unit
47

Advertisement

Table of Contents
loading

This manual is also suitable for:

C4

Table of Contents