Epson C Series Maintenance Manual page 558

6-axis robots
Hide thumbs Also See for C Series:
Table of Contents

Advertisement

C12 Maintenance 5. Joint #1
Installation: Joint #1 Electromagnetic brake (M/C Cable Downward)
NOTE
When tightening hexagon socket head cap bolts, refer to the 2.4 Tightening Hexagon Socket
Head Cap Bolts.
1. Install the Joint #1 brake to the brake plate.
Hexagon socket head cap bolts: 3-M4×25
Tightening torque: 4.0 ± 0.2 N·m
Be careful of the assembly direction of the Joint #1
electromagnetic brake. (See the photo)
2. Mount the Joint #1 brake plate to the Joint #1 motor unit.
For details, refer to C12 Maintenance: 5.1.1 Joint #1 - Replacing the Motor (M/C Cable Backward),
Installation step (4).
3. Install the brake power supply to the plate.
Make sure to install the brake power supply so that the cables
will be in the direction as shown in the photo.
Cross recessed head screws with washer: 2-M3×6
Tightening torque: 0.45 ± 0.1 N·m
4. Connect the M/C cable connectors.
Connector: X11, X010, BT1, BR011
5. Install the following covers.
Connector plate (M/C cable downward)
Base cover (M/C cable downward)
Base maintenance cover
For details, refer to C12 Maintenance: 3 Covers.
NOTE
If you disconnected the connector BT1 in the removal steps, perform calibration.
538
C Series Maintenance Manual Rev.2

Advertisement

Table of Contents
loading

This manual is also suitable for:

C4

Table of Contents