Epson C Series Maintenance Manual page 343

6-axis robots
Hide thumbs Also See for C Series:
Table of Contents

Advertisement

5.
Apply a thin coat of grease (SK-1A) to the O-ring.
Fit the O-ring to the groove on the reduction gear unit.
Do not allow the O-ring to come out of the groove.
If the O-ring is swollen, damaged, or deteriorated, replace it
with a new one.
6.
Temporarily fix the Arm #1 side arm to the Arm #1.
At this time, set the wave washer to the Arm #1.
Hexagon socket head cap bolts: 8-M6×2 5(with a plain washer)
■ There is a possibility of hands and fingers being caught and/or damage or
malfunction to the Manipulator. Be very careful when installing the arm. Have
at least two workers so that one can support the Manipulator while the other
CAUTION
worker is removing the bolts.
7.
Fix the Arm #2.
C8, C8L:
Hexagon socket head cap bolts: 16-M5×30
Tightening torque: 10.0 ± 0.5 N·m
C8XL:
Hexagon socket head cap bolts: 16-M6×35
Tightening torque: 18.0 ± 0.9 N·m
After fixing the Arm, check that there is no backlash or
misalignment on the reduction gear unit by moving the Arm by
hand.
C Series Maintenance Manual Rev.2
(with a plain washer)
(with a plain washer)
C8 Maintenance 6. Joint #2
323

Advertisement

Table of Contents
loading

This manual is also suitable for:

C4

Table of Contents