Epson E2C Series Manipulator Manual page 150

Scara robot
Table of Contents

Advertisement

Maintenance 6. Replacing the Reduction Gear Units (Joint #1)
■ Never adjust (loosen or tighten) the mounting bolts between the flexspline and
cross roller bearing unit. If the mounting bolts are adjusted, the flexspline and
cross roller bearing unit must be aligned by the maker of the reduction gear unit.
CAUTION
(10) Apply grease (SK-1A: Yellow) inside the flexspline.
■ When removing or installing the arm, there must be two or more people to work
on it so that at least one of them can support the arm while others are removing
the bolts. Removing the bolts without supporting may result in fall of the arm,
CAUTION
bodily injury, and/or malfunction of the robot system.
(11) For the prevention of grease leakage, put an O-ring on the joint area between Arm #1
(12) Mount Arm #1 on the base.
(13) Connect the connectors X110 and X11.
(14) Install the base connector box.
(15) Connect the power cable and signal cable to the base connector box (outside).
(16) Perform the calibration of Joint #1.
138
For details on the grease quantity, refer to Maintenance: 6.4 Greasing the Reduction
Gear Units. (The grease for the Joint #1 reduction gear unit is different from that
for the Joint #2 reduction gear unit.)
and the Joint #1 reduction gear unit.
To do so, install an O-ring in the groove of the clamp face on the Arm #1 side.
To do so, support the arm with two or more
people. Then, have another person secure
the mounting bolts for Arm #1.
For details on the installation method, refer to Maintenance: 3.4 Base Connector Box.
For details on the calibration method, refer to Maintenance: 14. Calibration.
8-M4×40
Arm #1
E2C Rev.6

Advertisement

Table of Contents
loading

Table of Contents