General Maintenance; Schedule For Maintenance Inspection - Epson E2C Series Manipulator Manual

Scara robot
Table of Contents

Advertisement

2. General Maintenance

Performing the inspection steps properly is essential to preventing trouble and maintaining
safety. This section describes schedule for maintenance inspection and the procedures.
Be sure to perform the maintenance inspection in accordance with the schedule.

2.1 Schedule for Maintenance Inspection

Inspection points are divided into five stages: daily, monthly, quarterly, biannual, and
annual. The inspection points are added every stage.
If the Manipulator is operated for 250 hours or longer per month, the inspection points
must be added every 250 hours, 750 hours, 1500 hours, and 3000 hours operation.
1 month (250h)
2 months (500h)
3 months (750h)
4 months (1000h)
5 months (1250h)
6 months (1500h)
7 months (1750h)
8 months (2000h)
9 months (2250h)
10 months (2500h)
11 months (2750h)
12 months (3000h)
13 months (3250h)
h = hour
E2C Rev.6
Maintenance 2. General Maintenance
Daily
Monthly
inspection
inspection
Inspection Point
Quarterly
Biannual
inspection
inspection
Annual
inspection
73

Advertisement

Table of Contents
loading

Table of Contents