Toshiba GR200 Series Instruction Manual page 961

Line differential protection ied
Hide thumbs Also See for GR200 Series:
Table of Contents

Advertisement

connection point#2 "User configurable condition". That is, set the scheme switch
[TPOS01-LGP1EXOT] to PLC and use "TPOS01IN_TMP_38".
Note: To identify the input and output signals of the other TPOS logics, see Table
††
4.9-16 for PLC#2, Table 4.9-17 for PLC#3 and Table 4.9-20 for the outputs.
Output signal to BO
The TPOS01 function, in Figure 4.9-29, can issue an "Operate" signal at the output-point
"TPOS01_P2EX_BO", when the TPOS01 function determine that the input signal "Remote-P2-
Control" is true.
Receiving "Operate command P3-control" from the remote-end
(iii)
Figure 4.9-28 depicts the reception of the operate command 'P3-control' from the remote-end.
Wait for a command
Select logics
P1 control from the remote-end
P2 control from the remote-end
P3 control from the remote-end
P1 control from the local-end
P2 control from the local-end
P3 control from the local-end
P1 control by the PLC function
P2 control by the PLC function
P3 control by the PLC function
Figure 4.9-30 Outline of operate command 'P3-control'
Input signal required mapping
Figure 4.9-31 illustrate the operate logic when an "Operate command P3 (Remote-P3-Control)"
signal is applied to the TPOS01 function. The input-point "DEV01_CONTROL_REQ" is used
for the reception of the "Operate command P3 (Remote-P3-Control)".
Wait for a next command
P1 control from the remote-end
P2 control from the remote-end
P3 control from the remote-end
Control logic
Signal reception in
IEC61850
P1 control from the local-end
P2 control from the local-end
P3 control from the local-end
P1 control by the PLC function
P2 control by the PLC function
P3 control by the PLC function
- 938 -
6F2S1914 (0.49)
Success
Operation
Signal output
decision
Do nothing
Failed
GRL200 (Soft 033 & 037)