Installing the 19" Chassis

There are two types of chassis; the controlling (with the CD-CP00-AU installed)
and the expansion (that does not have the CCPU blade installed). As
discussed in other chapters, multiple chassis can be linked together to expand
the port size of the system.
3.5.1

Unpacking the Equipment

Inspect the equipment for any physical damage. If you are not sure
about the function of a component, review the associated information
within this manual. Contact your authorized NEC Sales
Representative if you have additional questions. Note that the chassis
does not initially contain any blades.
Make sure you have appropriate tools for the job, including: a test set,
a punch down tool, and a digital voltmeter.
Ensure that you have a building plan showing common equipment,
extensions, the Telco demarcation and earth ground location before
you start installation. Be sure to properly plan your installation site and
that you are familiar with the installation safety precautions. If you
have not done that, please do so now. Refer to
Preparation and MDF/IDF Construction on page
3.5.2

Before Installation

Before installing the chassis check the following:
Ensure that the MPS7101(Power Supply Unit) is OFF and that that
the power cord is disconnected from the AC outlet.
When installing the blades, do not touch the soldered surfaces as
this may cause damage.
Follow safety precautions indicated in section
Information on page
3.5.3

Installing the 19" Controlling Chassis

1.
Ensure the chassis is powered down.
UNIVERGE SV8100/SV8300
for installation of blades.
4-1.
Do not remove or install this blade with the
power on.
Installing the SV8100 Chassis
to continue
2.2 Installing an
Section 2 Site
4-1.
2.1 Precautionary

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Univerge sv8300

Table of Contents