Install Ac Power Cords On Multiple Chassis (Optional); Install Additional Blades; Apply Power To The 19" Chassis; Battery Connection - NEC UNIVERGE SV8100 System Hardware Manual

Hide thumbs Also See for UNIVERGE SV8100:
Table of Contents

Advertisement

UNIVERGE SV8100/SV8300
B
S
4
ATTERY
ECTION
There are three types of battery connection to provide battery life in the event of a
power failure, internal battery, external battery without CHS LARGE BATT BOX and
external battery with CHS LARGE BATT BOX.
4.1
System Hardware Manual
3.5.10

Install AC Power Cords on Multiple Chassis (Optional)

Locate the supplied AC power cords and attach to the AC Inlets located
on the back of the Controlling and Expansion Chassis.

Figure 5-59 Install 19" AC Power Cords (Multiple-Chassis)

3.5.11

Install Additional Blades

Refer to Chapter 5,
6-2.
3.5.12

Apply Power to the 19" Chassis

Refer to Chapter 5,
C
ONNECTION

Install Internal Batteries

4.1.1

Install Internal Batteries CHS1U-AU Chassis

An internal battery source using two batteries can be installed using
the CHS1U BATT MTG KIT (mounting kit) and CHS1U BATT CA INT
BATT (internal cabling).
1.
Ensure the chassis is powered down.
2.
Disconnect AC power and grounding cable from rear of chassis.
2.1 Installation and Safety Precautions on page
2.6 Powering Up the SV8100 on page
Issue No. 1.5
AC
Power
Cords to
6-7.
5 - 47

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Univerge sv8300

Table of Contents