Issue No. 1.5
5 - 54
4.
With supplied screw, install cable guide in chassis (refer to
Figure 5-72 Installing Cable Support

Figure 5-72 Installing Cable Support Guide

5.
Install two batteries (12V-2.3AH) into the CHS2U BATT MTG KIT
(refer to
Figure 5-73 Installing Two
The first battery must be installed on the left side, then slid to the right
due to an installation tab on the mounting kit.

Figure 5-73 Installing Two Batteries

6.
Using the supplied screws, secure the brackets to the CHS2U
BATT MTG KIT (refer to
page
5-54).
UNIVERGE SV8100/SV8300
Guide).
Batteries).
Figure 5-73 Installing Two Batteries on
Installing the SV8300 Chassis