Issue No. 1.5
4 - 34
2.
3.
3.5.5
Install 19" Chassis Grounding
From the factory, the SG, ETH and PBXG grounds are located inside
the chassis and are connected to the FG ground (frame ground) on
the back of the chassis.
Each chassis (CHS2U-AU) in the system must be grounded
separately using the procedure listed below.
1.
Ensure each Chassis is powered down and unplugged.
Using the NEC provided CAT5 straight-through
cable(s), attach one end to each Expansion Chassis
CN2 connector on the PZ-BS11 blade (see
4-42 System Expansion Cabling on page
the opposite end to the CN2, CN3 or CN4 connector
on the PZ-BS10 of the Controlling Chassis.
Install in Expansion
Install in Expansion
Install in Expansion
Install in Controlling
Figure 4-42 System Expansion Cabling
Repeat for additional Expansion Chassis.
UNIVERGE SV8100/SV8300
4-34. Attach
Chassis
Chassis
Chassis
Chassis
Installing the SV8100 Chassis
Figure