Issue No. 1.5
Figure 4-58 Installing the CHS LARGE BATT BOX using the CHS2U JOINT BRACKET KIT
4 - 44
4.
Align and install the CHS LARGE BATT BOX on top of the CHS
BASE UNIT. Refer to
BATT BOX using the CHS2U JOINT BRACKET KIT on page
4-44.
5.
Secure the CHS LARGE BATT BOX to the CHS BASE UNIT
using the CHS2U JOINT BRACKET KIT. Refer to
Installing the CHS LARGE BATT BOX using the CHS2U JOINT
BRACKET KIT on page
4.2.2
Battery Installation
1.
Loosen screw on front of CHS LARGE BATT BOX. Refer to
Figure 4-59 Removing CHS LARGE BATT BOX
2.
Swing cover outward and detach from CHS LARGE BATT BOX.
Figure 4-58 Installing the CHS LARGE
4-44.
Figure 4-59 Removing CHS LARGE BATT BOX Cover
UNIVERGE SV8100/SV8300
Figure 4-58
Cover.
Installing the SV8100 Chassis