Mitsubishi Electric MELDAS 600M Series Instruction Manual page 482

Table of Contents

Advertisement

Error No.
PR0174
PR0180
PR0181
PR0182
PR0183
PR0184
PR0220
PR0221
PR0222
PR0223
PR0224
PR0230
PR0231
PR0232
PR0240
PR0241
Downloaded from
ManualsNet.com
CHAPTER 4 APPENDICES
Appendix 3. Alarm Messages
Message
The G11 command has been
No G11 spec.
issued even though there are no
program tool compensation input
(G11) specifications.
A fixed cycle command was
No fixed cycle
issued even though there are not
fixed cycle (G72 to G89)
specifications.
The spindle speed command has
No spindle
not been issued when the hole
command
drilling fixed cycle command is
(Tap cycle)
given.
Connection with the spindle unit
Synchronous tap
was not established.
error
The pitch or thread number
No pitch/thread
command has not been issued in
number
the tap cycle of a hole drilling fixed
cycle command.
The pitch or thread number
Pitch/thread number
command is not correct in the tap
error
cycle of a hole drilling fixed cycle
command.
There are no special fixed cycle
No special fixed
specifications.
cycle spec.
0 has been specified as the number
No. of special fixed
of holes in special fixed cycle.
holes = 0
0 has been specified as the angle
G36 angle interval
internal with G36.
error
The radius value is less than the
G12/G13 radius
compensation amount specified
error
with G12 or G13.
There are no circular cutting
No G12/G13 spec.
specifications.
A subprogram has been called 8
Sub-program nesting
or more times in succession from
over
the subprogram.
The sequence number set at
No N-Number
sub-program call time, at return
from the subprogram or specified
by GOTO, was not set.
When the subprogram is called, it
No program No.
is not registered.
A variable command was issued
No variable
even though there are no variable
command
command (#
The variable number commanded
No variable number
is higher than the variable
numbers in the specifications.
search engine
Details
• Check the specifications.
• Check the specifications.
Correct the program.
• Issue the spindle speed
command (S) when the hole
drilling fixed cycle command
G84 or G74 is given.
• Check the connection with the
spindle.
• Check that the spindle encoder
exists.
• Specifies the pitch data and the
number of threads via F or E
command.
• Check the pitch data or the
number of threads.
• Check the specifications.
• Reconsider the program.
• Reconsider the program.
• Reconsider the program.
• Check the specifications.
• Check the number of
subprogram calls and correct
the program so that it does not
exceed 8 times.
• Specify the sequence numbers
in the call block of the
subprogram.
• Register the subprogram.
• Check the specifications.
) specifications.
• Check the specifications.
• Check the program variable
number.
IV – 40
Remedy

Advertisement

Table of Contents
loading

Table of Contents