Commissioning The Parallel Connection - Siemens SINAMICS S120 Function Manual

Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

Function modules
9.10 Parallel connection of power units
Parallel connection (Chassis / Chassis-2) of two Active Line Modules and two Motor Modules on one
motor with a single winding system
In many cases, it is not possible to use motors with separate winding systems, for example, in
the following cases:
● The required number of separate winding systems cannot be realized due to the pole
number.
● The motor is delivered by a third party.
● A motor with a common winding system is already present.
In such cases, the outputs of the Motor Modules connected in parallel are interconnected via
the motor cables in the motor terminal box.
Active Interface Modules isolate switching-frequency harmonics from the supply connection
and thus effect basic interference suppression of the supply system. These modules are
essential to the operation of Active Line Modules. The Voltage Sensing Module VSM10 also
helps Active Line Modules to operate without any disturbances when the line supply conditions
are unfavorable (e.g. significant voltage fluctuations, brief interruptions in the line voltage). For
ALMs in the Chassis and Chassis-2 formats, the VSMs are already integrated in the Active
Interface Modules.
9.10.2

Commissioning the parallel connection

During commissioning, power units connected in parallel are treated like one power unit on the
line or motor side.
In order to ensure the appropriate defaults for the circuit current controller, the type of winding
system must be configured in p7003.
Note
Connecting Motor Modules in parallel in the Vector control mode
You have created an OFFLINE project in vector control with parallel-connected Motor Modules
and then transfer it ONLINE to the Control Unit (CU). To save the project in the CU, you must
perform a POWER ON. The next time you switch on you receive an error message that the
ONLINE topology is inconsistent. Load the project now to the programming device. This
resolves the inconsistency.
For further detailed information about commissioning, restrictions regarding operation and
parameterization options, please refer to the following manuals:
● SINAMICS S120 Commissioning Manual with Startdrive
● SINAMICS S120/S150 List Manual
528