Hitachi CHROMASTER 5160 Instruction Manual page 835

Table of Contents

Advertisement

Syringe valve
4
Plunger
wash
va/2
Syringe
Wash
fluid1
(4)
Buffer tube
Injection valve
3
2
1
5
Wash pump
P
3-way solenoid valve
Degassing
unit
vd :Dead volume (the instrument inside parameter)
vi :Injection volume (the sample net volume to the flow path)
vw :Waste volume (the air volume of the lead and rear part of a sample)
va :Air volume (the air volume which sample is sandwiched.)
Wash
fluid2
Wash of the needle outer wall with the wash fluid1
The syringe aspirates one-half of the air volume (:va/2) while
needle is moving to the wash port.
Deliver the wash fluid1 via the wash pump to wash the needle
outer wall.
5
Loop
6
Waste
1
solution
From Pump To Column
2 - 39
Needle
Injection port
va/2
4
3
2
Waste
solution
Wash port
Rack
Sample

Advertisement

Table of Contents
loading

Table of Contents