Download Print this page

Toshiba GR-200 Series Instruction Manual page 310

Multi functional protection ied
Hide thumbs Also See for GR-200 Series:

Advertisement

Check logic for the voltage and the synchronism
2.25.4
The VCHK function can send the permissive signal when the results of the voltage check and
synchronism check are successful, as described earlier. Figure 2.25-8 illustrates that the ARC-
VCHK signal is sent to the ARC function when one or more of the following conditions are
established: (1) Synchronism check operates, (2) the OVB and UVL elements operate, (3) the
UVB and OVL elements operate or (4) the UVB and UVL elements operate. To engage the
check logic in the VCHK function, the user should set the [ARC-LB_DL], [ARC-DB_LL], [ARC-
DB_DL], and [ARC-SYN1] switches. For example, if the DB_LL condition, (see Table 2.25-1) is
the only criteria for ARC operation, On should be set for the scheme switch [ARC-DB_LL] while
Off is set for the others. As a result, the ARC can reclose the CB on receiving the permissive
signal from the VCHK function. Note that the SYN-df dose not operate when Off is set for the
[SYN-dfEN].
8C00011B67
L1
8D00011B68
L2
OVL
8E00011B69
L3
8200011B62
OVB
8000011B63
UVB
8300011B60
OVL
8100011B61
UVL
8400011B64
SYN-dƟ
8500011B65
SYN-dV
SYN-df
Off
SYN-dfEN
On
ARC-LB_DL
On
ARC-DB_LL
On
ARC-DB_DL
On
ARC-SYN
On
ARC-NOVCHK
Off
ARC-VCHK
†Note: Signal "VCHK_OVL3P" may be used when the user wishes to check for the
presence of respective phase-voltages on the line.
&
&
&
&
8600011B66
Figure 2.25-8 VCHK Logic
T_OVL3P
8F00011B6F
t
0
0.01-100.00s
T_LB_DL
8000011B6D
t
0
0.01-100.00s
T_DB_LL
8100011B6E
t
0
0.01-100.00s
T_DB_DL
8200011B70
t
0
0.01-100.00s
T_SYN
8200011B72
t
0
0.01-100.00s
- 291 -
6F2T0200 (0.15)
VCHK_OVL3P
8000011B23
&
ARC-VCHK
&
&
&
GRE200 (1,2)
To ARC

Advertisement

loading

This manual is also suitable for:

Gre200-1Gre200-2