4-PAW DIESEL/LOADER ARM
5. Install a pivot pin through the frame and loader arm
pivot point (Fig. 1572).
6. Repeat for the opposite side.
7. Install a pivot pin through the lift cylinder and loader
arm pivot point (Fig. 1573).
6/3-8
Fig. 1572
DSC-1462a
Fig. 1573
DSC-1463a
8. Repeat for the opposite side.
9. Using a 1/2" socket, install 4 bolts to secure the pivot
pins to the upper frame and lift cylinders on both
sides of the machine. Torque the bolts to 19 ft-lbs.
(26 Nm) (Fig. 1574 and Fig. 1575).
Toro Wheeled CUL Service Manual
Fig. 1574
DSC-1466a
DSC-1467a
Fig. 1575