Testing The Cc-Link Ie Controller Network Module - Mitsubishi Electric MELSEC Q Series Reference Manual

Cc-link ie controller network
Hide thumbs Also See for MELSEC Q Series:
Table of Contents

Advertisement

5.4

Testing the CC-Link IE Controller Network Module

This section describes the tests of the CC-Link IE Controller Network module.
Before starting up the system, the test is to be performed to check the CC-Link IE Controller Network module and
cables.
Perform each test according to the following.
Mount the CPU module, power supply module,
CC-Link IE controller network module, etc. to the base unit.
No
network module with external
Before applying external power (24V DC)
Check the external power voltage of the CC-Link IE
controller network module is within the specified range.
Connect wires to the external power supply terminal
block of the CC-Link IE controller network module.
Applying external power (24V DC)
Turn ON the external power (24V DC).
the CC-Link IE controller network
Turning OFF external power (24V DC)
Turn OFF the external power (24V DC).
150
Start
Mounting modules
Is it CC-Link IE controller
power supply function?
Yes
Wiring
Is the EXT.PW LED on
module ON?
ON
1)
The CC-Link IE controller network module hardware
OFF
may be faulty. Please consult your local Mitsubishi
representative.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec qj71gp21-sxMelsec qj71gp21s-sx

Table of Contents