5.4
Testing the CC-Link IE Controller Network Module
This section describes the tests of the CC-Link IE Controller Network module.
Before starting up the system, the test is to be performed to check the CC-Link IE Controller Network module and
cables.
Perform each test according to the following.
Mount the CPU module, power supply module,
CC-Link IE controller network module, etc. to the base unit.
No
network module with external
Before applying external power (24V DC)
Check the external power voltage of the CC-Link IE
controller network module is within the specified range.
Connect wires to the external power supply terminal
block of the CC-Link IE controller network module.
Applying external power (24V DC)
Turn ON the external power (24V DC).
the CC-Link IE controller network
Turning OFF external power (24V DC)
Turn OFF the external power (24V DC).
150
Start
Mounting modules
Is it CC-Link IE controller
power supply function?
Yes
Wiring
Is the EXT.PW LED on
module ON?
ON
1)
The CC-Link IE controller network module hardware
OFF
may be faulty. Please consult your local Mitsubishi
representative.