Mitsubishi Electric MELSEC Q Series Reference Manual page 409

Cc-link ie controller network
Hide thumbs Also See for MELSEC Q Series:
Table of Contents

Advertisement

(e) SEND instruction execution timing
• When completed normally
Sequence scan
Start contact
Own station CPU
Completion device
(Device specified in (D1))
Completion status indication
device (Device of (D1)+1)
CC-Link IE Controller
Network module
CC-Link IE Controller
Network module
Sequence scan
RECV execution request
flag (Channel 3) (SB0032)
Target station CPU
Completion device
(Device specified in (D2))
Completion status indication
device (Device of (D2)+1)
Receive data storage device
(Device specified in (D1))
SEND
(With arrival confirmation)
0
END
0
OFF
Channel 1
Data
transmission
Channel 3
RECV
0
END
0
END
0
OFF
CHAPTER 9 DEDICATED INSTRUCTIONS
END
0
END
0
END
1 scan
Storage
completed
END
0
END
1 scan
Receive data
9
0
END
0
END
407

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec qj71gp21-sxMelsec qj71gp21s-sx

Table of Contents