Mitsubishi Electric MELSEC Q Series Reference Manual page 642

Cc-link ie controller network
Hide thumbs Also See for MELSEC Q Series:
Table of Contents

Advertisement

The following is an interlock of a communication program using the cyclic transmission status of the own
Ex.
station and the station number 2.
MELSECNET/H
CC-Link IE Controller Network
Using an existing sequence program without change may not be allowed due to some reason such as link scan time
difference between CC-Link IE Controller Network and MELSECNET/H.
Be sure to check the operation.
640
Communication program with Station No.2
Communication program with Station No.2
SB0047: Baton pass status (host)
SB0049: Host data link status
SW0070: Baton pass status of each station
SW0074: Cyclic transmission status of each station
SB0020: Module status
SB0047: Baton pass status (own station)
SB0049: Data link status of own station
SW00A0: Baton pass status of each station
SW00B0: Cyclic transmission status of each station

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec qj71gp21-sxMelsec qj71gp21s-sx

Table of Contents