Logging - Mitsubishi Electric MELSEC Q Series Reference Manual

Cc-link ie controller network
Hide thumbs Also See for MELSEC Q Series:
Table of Contents

Advertisement

10.3.3

Logging

The history for the communication path switching and transient transmission error can be monitored and the error
information can be cleared.
Note that these operations are not available in circuit test mode.
1.
Open the "CC IE Control Diagnostics" window. (
2.
Click the
3.
Perform the operation with reference to the description below.
(1) "Monitor Details" tab
The history for the communication path switching and transient transmission error is displayed.
Page 526, Section 10.3)
button.
CHAPTER 10 TROUBLESHOOTING
533
10

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec qj71gp21-sxMelsec qj71gp21s-sx

Table of Contents