Fujitsu 1FINITY L100 User Manual page 16

Table of Contents

Advertisement

Compliance
Information—
L100/L110-Specific
L100 UL Labels
L110 UL Labels
UL Fuse Ratings
Model/Type Reference
L100 (BDL1-3R11)
L110 (BDL1-3B11)
General Compliance
■ NEBS Level 3:
• GR-63-CORE Issue 04 (including Seismic Zone 4
requirements)
• GR-1089-Electromagnetic Compatibility (EMC) and Electrical
Safety
• GR-3108-Class 1 - Equipment in the Outside Plant (OSP)
■ GR-1089, Section 9 (Bonding and Grounding) required
installation standards:
• Installed in a Common Bonding Network (CBN)
• Installed in NEBS Level 3 environments, for example, Central
Offices as well as Customer Premise Environment (CPE)
• Installed in accordance with a DC-C or DC-I configuration
Rating
–48 V DC, 7.5 A MAX
–48 V DC, 6 A MAX
■ GR-1089, R4-16, R4-18 (Intra-Building Lightning Protection)
Warning: All metallic signaling cables
should be shielded with the shield
grounded at both ends to meet intra-
building lightning requirements.
Warning: The intra-building port(s)
(USER1, USER2, LMP, UTLP, and MAINT)
of the equipment or sub assembly is
suitable for connection to intra-building
or unexposed wiring or cabling only. The
intra-building port(s) of the equipment

Advertisement

Table of Contents
loading

Table of Contents