Fujitsu 1FINITY L100 User Manual page 198

Table of Contents

Advertisement

198
Initial System Turn Up
Provision L160 Tributary Blade
Note: If autoprovisioning is enabled, the Fan unit slots are automatically provisioned.
Commands:
% set eqpt shelf 101 slot FAN1 cardType ACL8-3PC1 admin-status up
% set eqpt shelf 101 slot FAN2 cardType ACL8-3PC1 admin-status up
% set eqpt shelf 101 slot FAN3 cardType ACL8-3PC1 admin-status up
Step 3
Provision the E1 port on the L160 tributary blade.
Note: If autoprovisioning is enabled, the E1 port is automatically provisioned.
Command:
% set eqpt shelf 101 slot 0 cardType BDL1-3M21 subslot 0 port E1 admin-status up
pluggableInterfaceType Edge num-lanes 128
Step 4
Provision the client port C1 on the L160 tributary blade.
Note: If autoprovisioning is enabled, the client port C1 is automatically provisioned.
Command:
% set eqpt shelf 101 slot 0 cardType BDL1-3M21 subslot 0 port C1 admin-status up
pluggableInterfaceType Client num-lanes 128
Step 5
Save the changes.
Command:
% commit
✓ 
This task is complete.
Additional Instructions:
Perform the same procedure for each L160 additional blade to be provisioned.
·
Fujitsu and Fujitsu Customer Use Only
Release 19.1.1
Issue 1.1, May 2021

Advertisement

Table of Contents
loading

Table of Contents