Provision Raman Port Connections - Fujitsu 1FINITY L100 User Manual

Table of Contents

Advertisement

256
ROADM Turn-Up and Operations

Provision Raman Port Connections

7.3

Provision Raman Port Connections

Prerequisites:
■ Appropriate Raman fiber-optic cable connection must be completed. For more information, refer to
Install
L160 Raman
Cabling.
■ L100 and L160 Blades must be provisioned
This procedure describes how to provision port-connection between Raman blade and L100 Blade.
Note: L100 Blade Issue 14, FC95453R11-I14, and later blade must be used with L160 Raman blade.
Step 1
Provision the edge port E1 of L100 Blade.
Note: If autoprovisioning is enabled, the E1 port is automatically provisioned.
Command:
% set eqpt shelf 1 slot 0 cardType BDL1-3R11 subslot 0 port E1 admin-status up
pluggableInterfaceType Edge num-lanes 128
Step 2
Provision the client port C1 on the Raman tributary blade.
Note: If autoprovisioning is enabled, the client port C1 is automatically provisioned.
Command:
% set eqpt shelf 101 slot 0 cardType BDL1-3M21 subslot 0 port C1 admin-status up
pluggableInterfaceType Client num-lanes 128
Step 3
Provision port-connection between Raman client port and L100 edge port.
Command:
% set port-connection D1-RAMAN src-shelf 101 src-slot 0 src-subslot 0 src-port C1
dst-shelf 1 dst-slot 0 dst-subslot 0 dst-port E1
✓ 
This task is complete.
·
Fujitsu and Fujitsu Customer Use Only
Release 19.1.1
Issue 1.1, May 2021

Advertisement

Table of Contents
loading

Table of Contents