Fujitsu 1FINITY L100 User Manual page 177

Table of Contents

Advertisement

Initial System Turn Up
Configure IP Connection to DCN
Conceptual Walk Through of Provisioning
Assume that the NEs at Site A and Site B already connect to the DCN through LCN1 and all OSC links are up and
running. The objective is to use the OSC links to propagate DCN connectivity to the other NEs in the network.
The following figure shows provisioning for two representative NEs (Site B and Site C) with the understanding
that similar provisioning is required at other NEs (to propagate DCN connectivity throughout the network).
Virtuora NC
Virtuora User
NETCONF/
Interface
YANG
DCN
WebGUI
CLI
Remote Users
Figure 92
Provisioning Two Representative NEs
The following figure shows the initial configuration of NEs at Site B and Site C.
·
Release 19.1.1
Issue 1.1, May 2021
Site A
Switch
LCN1
Router
1FINITY
LAN cable
ROADM
LAN
1FINITY
LAN
LCN1
1FINITY
Router
ROADM
Switch LAN cable
Site B
1FINITY
ROADM
OSC
1FINITY
ILA
ROADM
OSC
OSC
1FINITY
ROADM
Site C
177
1FINITY
ROADM
OSC
1FINITY
ILA
Fujitsu and Fujitsu Customer Use Only

Advertisement

Table of Contents
loading

Table of Contents