ABB IRB 6640 - 180/2.55 Product Manual page 199

Articulated robot
Table of Contents

Advertisement

3HAC026876-001 Revision: C
Action
3. Disconnect connectors R1.MP and R1.SMB.
4. Remove the cable holder on the frame
securing the cable harness.
5. Pull the cable and connectors up through the
cable guide in the center of the frame.
6. Disconnect all connectors at motors 1 and 2.
7. Open the SMB cover carefully.
The cable between the battery and the SMB-
unit may stay connected, in order to avoid an
update of the revolution counter. Be careful not
to let the weight of the cover strain the cable!
In order to remove the cover completely, the
connector R1.G must be disconnected! This
causes a necessary updating of the revolution
counter!
8. Disconnect connectors R2.SMB, R1.SMB1-3,
R1.SMB4-6 from the SMB unit.
Disconnect X8, X9 and X10 from the brake
release unit.
4.3.1. Replacement of cable harness, axes 1-6
Note
Shown in the figure
harness on page
xx0700000104
4 Repair
Continued
Location of cable
193.
Continues on next page
197

Advertisement

Table of Contents
loading

Table of Contents