ABB IRB 6640 - 180/2.55 Product Manual page 216

Articulated robot
Table of Contents

Advertisement

4 Repair
4.3.3. Replacement of cable harness, Cleanroom
Continued
Refitting cable harness - lower end
The procedure below details how to refit the lower end of the cable harness, Cleanroom.
214
Action
1.
DANGER!
Turn off all electric power, hydraulic and pneumatic
pressure supplies to the robot!
For Foundry Prime robots: Do not turn off the air
pressure to motors and SMB.
2.
CAUTION!
The cable package is sensitive to mechanical
damage. They must be handled with care,
especially the connectors, in order to avoid
damaging them.
3. Push the cable harness and connectors carefully
down through the cable guide in the center of the
frame.
Make sure that the cables are not twisted with each
other!
4. Reconnect the earth cable.
5. Reconnect the connectors R1.MP and R1.SMB at
base.
6. Refit the rear cover plate with its attachment screws. Shown in the figure
Note
xx0800000046
Parts:
A: Cable harness
Shown in the figure
Location of
cable harness, Cleanroom on
page
207.
Shown in the figure
Location of
cable harness, Cleanroom on
page
207.
Location of
cable harness, Cleanroom on
page
207.
Continues on next page
3HAC026876-001 Revision: C

Advertisement

Table of Contents
loading

Table of Contents