ABB IRB 6640 - 180/2.55 Product Manual page 305

Articulated robot
Table of Contents

Advertisement

Replacement of the motor axis 1 (Foundry Prime)
Robots working with Foundry Prime and that have the special tightness for this application
require special repair routines to maintain the tightness level.
The repair must be done according to the previous repair procedures with the following
additions.
3HAC026876-001 Revision: C
Action
10. Refit the cable gland cover at the cable exit with its
two attachment screws.
11. Refit the motor cover with its four attachment
screws.
12. Recalibrate the robot!
13.
DANGER!
Make sure all safety requirements are met when
performing the first test run. These are further
detailed in section
DANGER - First test run may
cause injury or damage! on page
Action
1.
DANGER!
Turn off all electric power, hydraulic and
pneumatic pressure supplies to the robot!
For Foundry Prime robots: Do not turn off the air
pressure to motors and SMB.
4.6.1. Replacement of motor, axis 1
Note
Make sure the cover is tightly
sealed!
Make sure the cover is tightly
sealed!
Calibration is detailed in a
separate calibration manual,
enclosed with the calibration tools.
General calibration information is
included in section
information.
33.
Note
4 Repair
Continued
Calibration
Continues on next page
303

Advertisement

Table of Contents
loading

Table of Contents