Procedure Dual Cabinet Controller - ABB IRC5 Product Manual

Robot controller
Hide thumbs Also See for IRC5:
Table of Contents

Advertisement

2 Installation and Commissioning, IRC5
2.9.10. Installation of Hot plug
Continued

Procedure Dual Cabinet Controller

The procedure below details how to install the hot plug button in the Dual Cabinet Controller.
148
Action
1.
DANGER!
Before any work inside the cabinet, please
observe the safety information in section
DANGER - Make sure that the main power
has been switched off! on page
2.
esd
WARNING!
The unit is sensitive to ESD, before
handling the unit please observe the safety
information in section
WARNING - The unit
is sensitive to ESD! on page 29
3. Disconnect the cable from the ethernet
connector for FlexPendant on the computer
unit.
Note/Illustration
28.
DSQC623:
xx0400000960
A: Connector A32.A8
DSQC639:
xx0600002897
A: FlexPendant port
3HAC021313-001 Revision: K
Slot 1 Slot 2 Slot 3 Slot 4 Slot 5
Continues on next page

Advertisement

Table of Contents
loading

Table of Contents