2.3.3 Lifting the base plate
Required equipment
Equipment
Lifting eye, M24
Lifting slings
Hole configuration
xx1400002587
Product manual - IRB 8700
3HAC052853-001 Revision: F
Article number
© Copyright 2015-2018 ABB. All rights reserved.
2 Installation and commissioning
2.3.3 Lifting the base plate
Note
1 pc
1 pc
Length: approx. 2 m
Continues on next page
67