ABB IRB 8700 Series Product Manual page 280

Hide thumbs Also See for IRB 8700 Series:
Table of Contents

Advertisement

4 Repair
4.5.1 Replacing the upper arm
Continued
1
2
3
4
5
Continues on next page
280
Action
Inspect the pre-mounted gamma sealing
on the KM nut.
Inspect sealing ring.
Refit sealing ring.
Wipe clean the KM nut.
Wipe clean the o-ring in the KM nut.
© Copyright 2015-2018 ABB. All rights reserved.
Note
xx1600000083
xx1600000084
xx1600000084
xx1600000193
Product manual - IRB 8700
3HAC052853-001 Revision: F

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 8700-550/4.20Irb 8700-800/3.50Irc5

Table of Contents